Home > NEWS > Industry News

Mercedes-Benz Arena (Stuttgart)

2018-08-24
the stadium was originally built in 1933 after designs by German architect Paul Bonatz. After It was built, it was named "Adolf-Hitler-Kampfbahn". From 1945 to 1949 it was called Century Stadium and later Kampfbahn and was used by US Troops to play baseball.The name Neckarstadion was used since 1949. It is home to VfB Stuttgart in the Bundesliga.

Before 1993 it was called Neckarstadion, named after the nearby river Neckar and between 1993 and July 2008 it was called Gottlieb-Daimler-Stadion . From the 2008–09 season, the stadium was renamed the Mercedes-Benz Arena, starting with a pre-season friendly against Arsenal on 30 July 2008.

membrane structure,canopy,tensile membrane structure,steel structure

The redevelopment was announced along with the stadium's name change in late March 2008. The first computer images of the new arena were released at the same time, also showing a large cube with four video scoreboards above the centre circle, similar to the one in the Commerzbank-Arena in Frankfurt.
Starting in 2009, the Mercedes-Benz Arena has been redeveloped into a football-specific stadium. New stands were constructed during the summer of 2011, with pitch level being lowered by 1.30 metres in time for the beginning of the 2009–2010 season. After the interior redevelopment finished, the roof was expanded to cover all the new rows of the seats. The entire construction was completed by the end of 2011.

The Mercedes-Benz Arena features a unique fabric roof construction, making it easily recognizable. Made of precision-tailored membranes of PVC-coated polyester, the roof tissue is durable enough to withstand 1,000 kg of weight per square decimeter. It is suspended from an aesthetic steel frame that runs around the entire stadium weighing 

membrane structure,canopy,tensile membrane structure,steel structureapproximately 2,700 metric tons. The steel cables connecting the roof to the frame alone weigh about 420 tons. The roof was added during the refurbishment preceding the 1993 World Athletics Championships

Fill in your project requirement to us