The air dome ice rink in Xinhua District, Shijiazhuang, Hebei, contracted by Sigma Group.
It has a total area of 1,505 square meters and a membrane material size of 2,708 square meters.
The 35-day construction period is short, and all the processing and production of the membrane project can be completed in the factory according to the design.
Compared with the construction cycle of traditional buildings, it is several times faster. The project undertaken by Farley is generally committed to a construction period of 2-3 months, and it can be completed in 40 days if the construction period is rushed. The energy consumption is low, the film material has high reflectivity and low light absorption, and the thermal conductivity is low, which largely prevents solar energy from entering the room.
In addition, the translucency of the film material ensures proper natural diffuse light to illuminate the room.