The Saudi Mecca electric sunshade contracted by Sigma Group. It uses PTFE architectural membrane materials to make its appearance and shape diversified, and its overall appearance is beautiful and atmospheric.
The membrane structure is practical, artistic, and compatible. Fusion of local environments. The size of the project is 6m/9m/12m in diameter. The construction of the project is simple, the construction period is short, and the construction period is only 15 days.
The project has a fully automatic hydraulic control system. The opening time of the entire umbrella is one minute and thirty seconds, and the closing time is only one minute and thirty seconds, which can be remotely controlled.