Membrane structure engineering is a kind of construction engineering field. It consists of membrane structure modeling design, mechanical analysis, cutting design, production and installation of membrane products, production and installation of supporting structures or components, etc. It is a collection of architecture and engineering structures. A multi-disciplinary cross-application project integrating science, materials science and other disciplines.
If you can see the appearance of membrane structure projects in entertainment spaces, commercial streets, building entrances, and green roads in tourist attractions, you must be curious how long the construction period of a membrane structure project will take? Now, let us start to talk about this issue!
Generally speaking, the construction period of membrane structure works is about 20 days. However, the factors that affect the construction cycle include manufacturers, construction teams, weather conditions, logistics and transportation.
1. The influence of the manufacturer: Then, according to the different years, the production and processing technology are also different, and the production cycle is also different.
2. The impact of the construction team: different construction teams, the completion time of the construction is not the same, the experienced construction team, then the setup time will be fast, and the inexperienced construction team will slow down.
Through the introduction of the above content, I believe that everyone has a certain understanding, and I hope that it can be helpful to everyone.