Home > NEWS > Company news

Huaihua Sports Center

2021-08-27

The Huaihua Sports Center, contracted by SIMGA Group. It was completed in April 2017. The size of the project is 9,250 square meters, and it took 88 days to complete the construction.

Huaihua Sports Center uses a skeleton membrane structure. The skeleton membrane structure is composed of a stable skeleton system and a membrane body. The skeleton system determines the shape of the building, and the membrane body is the covering.

The remarkable feature of the skeleton membrane structure is that the membrane is not a necessary structural unit to maintain the existence of the structural system, and it is not only a simple covering roof system, but also gives full play to the lighting building function and high-strength stress characteristics. Skeleton membrane structure is a form that is frequently used in membrane structure engineering.

Fill in your project requirement to us

Please fill in the demand information, we will contact you within 24 hours.

点击这里给我发消息 Consultation

点击这里给我发消息 Consultation