PROJECT INTRODUCTION:
Project Name: Wuhan TianDi Construction Electrical Retractable Canopy
Dimension: Membrane material size 16000㎡.
Duration: 30 Days
Long Span : 180 meters
Finish Time:2020 / 11 / 23
The Wuhan TianDi Construction Electrical Retractable Canopy, contracted by SIGMA Group. It was completed in November 2020. The size of the project is 16,000 square meters, and it only took 30 days to complete the project.
The project type of Wuhan TianDi Construction Electrical Retractable Canopy is a large-span electric canopy. The single chip has a span of more than 180 meters and a single chip of more than 10 meters in width. There is no need for any steel support in the middle. The one-button remote control device can open any one of the canopy at will, and can also close any one canopy at will.
It can realize one-button remote control and fully automatic The azimuth covers the foundation pit, modular design and operation, truly automatic and intelligent canopy, and we also have the national high-tech patent product certificate.